Pattern Errata

We make every effort to keep our patterns error-free but mistakes will happen. You can find corrections listed alphabetically by pattern name below. If you purchased a pattern digitally you will automatically receive an updated pattern when a correction is made. If you have purchased a paper pattern this page serves as a record of any changes made. If you purchased a paper pattern that has been edited you can request a new copy by contacting customer service at help@harrisville.com


Alphabetical according to pattern name:

ALSTEAD VEST


Right Front: Begin Neck and Armhole Shaping

Row 3: Armhole decrease K to last 4 sts, k2tog, k2. [1 st dec’d]. 37 (41, 45, 45, 49, 53) sts rem

Right Front: Continue Neck Shaping

Row 3: Neck decrease K2, ssk, k to end [1 st dec’d]. 27 (31, 35, 35, 33, 37) sts rem.

Left Front: Begin Neck and Armhole Shaping

Row 3: Armhole decrease K2, ssk, k to end [1 st dec’d]. 37 (41, 45, 45, 49, 53) sts rem.

Left Front: Continue Neck Shaping

Row 3: Neck decrease K to last 4 sts, k2tog, k2 [1 st dec’d]. 27 (31, 35, 35, 33, 37) sts rem.

ASTRAGAL

YOKE (page 78)

Short Row 5: Create DS,  patt to end.

BODY

Work straight in reverse St st until the piece measures 37.5 (39, 39.5, 40, 40.5, 41.5, 41.5, 42.5, 42.5)cm / 14¾ (15¼, 15½, 15¾, 16, 16¼, 16¼, 16¾, 16¾)” down centre Back.

Next round: Purl and at the same time evenly inc 0 (0, 4, 4, 10, 2, 8, 12, 12) sts. 216 (240, 264, 288, 312, 336, 360, 384, 408) sts

HEM

Round 1:  Work row 1 of Chart B 9 (10, 11, 12, 13, 14, 15, 16, 17) times across the round.

Rounds 2-11: Continue as set by round 1, working next row of chart each time, until row 11 of Chart B is complete.

BARNES

Corrections made November 7, 2022

The Right Front chart has been updated to correct the first three stitches of the chart (i-cord stitches). I-cord should be worked as for Left Front:

RS: slip 3 sts with yarn in front. WS: Knit 3 sts.

Page 3

Pocket Lining

Next row – Increase row (RS): P1, (M1, k3) 5 (6, 6, 6, 6, 6, 6, 6) times, (M1) 0 (1, 1, 1, 1, 1, 1, 1) time, k0 (1, 1, 1, 1, 1, 1, 1), p1—22 (28, 28, 28, 28, 28, 28, 28) sts.

Page 11

SHAPE NECK AND COLLAR

Row 1 – Shaping Row (RS): Work 3 sts as est, M1L in pattern, work as est to 2 sts before placket m, M1R in pattern, k2, sm, p1, ssp, work to end. 2 sts inc’d, 1 st dec’d.

SHAPE SLEEVE

NOTE: Incorporate increases into the Moss Stitch pattern, maintaining slip stitch selvedge at each edge. Use Inc-R or Inc-R/p at the beginning of row and Inc-L or Inc-L/p at the end of row to create knit or purl stitches as needed to maintain the pattern.

Next row – Increase Row (RS): K1 , Inc-R in pattern, work as est to last st, Inc-L in pattern, k1. 2 sts inc’d. 55 (55, 55, 55, 59, 59, 59, 59) sts.

CARR HAT

The first version of this pattern was missing the instruction to change to a larger needle after completing the brim. Pattern should read as follows:

BEGIN HAT BODY AND CROWN

Change to Main Fabric Needle. Work Hat Body and Crown from written instructions below, or from chart as follows:

CAELUM TUNIC

Correction made June 2023

Correction to page 5, inserted between hem finishing and neckline finishing sections: join shoulders: Place Back and Front sts for Right Shoulder onto a spare circ with RS together. Beg at Right Shoulder edge, and using three-needle bind off, BO all Right Shoulder sts. Rep for Left Shoulder.

COOMBE DAYLIGHTS & NIGHTSHADES

Correction made October 27, 2022

In order for the written instructions to match the short row chart (which is correct) Short Row 9 should read as follows:

Short Row 9 (RS): Make double st, k1, p2, k2, sm, (k1, p2, k1) to next m, sm, work raglan sts in pattern to next m, sm, M1PL, k2, (p2, k2) to BOR m, M1PR, sm, k to last double st and work as one st, then k4, turn. 2 sts inc’d

None

None

FLYNN SCARF/WRAP

Updated March 2022

The purl increases listed under Abbreviations have been updated to match the chart legend. Instead of Inv-L/p and Inv-R/p, use the following:

Inc-R/p (Increase – Right/purl): Lift the right leg of the stitch below the next stitch on L needle and place on L needle, purl the lifted stitch. (1 st increased; leans right)

Inc-L/p (Increase – Left/purl): Lift the left leg of the stitch 2 rows below the stitch just worked and place on L needle, purl the lifted stitch through the back loop. (1 st increased; leans left)

None

HADEAN

Updated April 2022

Page 7

Pattern has been updated to included Steek Chart.

None

None

KENNAWAY

Moss stitch sections are represented as a 2-stitch repeat at the right and left side of each chart. Written instructions are as follows:

Moss Stitch (even number of sts)

Row 1 (RS): *k1, p1; repeat from * to end.

Row 2 (WS): Work as for Row 1.

Row 3: (RS): *p1, k1; repeat from * to end.

Row 4: (WS): Work as for Row 3.

Repeat Rows 1–4 for pattern.

KIRSTEN PULLOVER

On Page 3 after Begin Stitch Pattern first line should read:

Next row: (RS) Purl until next m, sm, work Main Chart until next m, sm, purl until end of row.

None

None

None

None

None

None

None

SCHNEEFLOCKEN

Updated January 2022

Page 5

Begin Body Shaping:

Next rnd - inc rnd: *K3, LLI, k until 3 sts before m, RLI, k3, sm; rep from * once more. 4 sts inc'd.

Secale Raglan

Correction made December 15, 2022

Page 2

LLI: (Left Lifted Increase) Slip the next stitch purl-wise. Lift the left leg of the stitch 2 rows below the stitch on right-hand needle onto left-hand needle and knit it through the back loop (1 stitch inc’d).

Page 8

Left Sleeve

Work Left Sleeve as for Right Sleeve until Shape Top of Sleeve, 22 (24, 26, 26, 26, 26, 26, 26, 26, 26, 26) sts.

Next row – dec row: (RS) Knit until 5 sts before end, C3R-dec, k2, 1st dec’d.

SHEEPSCOT MITTS

Correction made November 3, 2022

Page 3

LEFT THUMB GUSSET ONLY (corrected to read as follows)

Inc-R, k2, Inc-L, pm for gusset, work rib as est to m, work moss stitch to end of rnd.

UPPER BORDER

Rnd 1: *K2, p2; repeat from * to end of rnd.  Repeat last rnd until upper border measures ¾" / 2 cm (or desired length).

SWANZEY MITTS

Updated June 2021

Chart and instructions for larger size have been revised. For the most recent version of the pattern please contact customer service at: https://harrisville.com/pages/contact-us

TRADITIONAL ALBANIAN SWEATER

This pattern is no longer supported.

TSTUTA HAT

Updated January 2022

Chart has been corrected to make the following change:

There was an extra p2tog in Row 35 of the chart. The first stitch in the row should be a purl. The second stitch is a p2tog.

None

VALKYRIE

Updated January 2022

Changes have been made to the body set-up instructions.

New Text for Body set-up on page 4

BEGIN BODY CHARTS

Next row – Decrease row (RS): Work rib as established over 40 (48, 56, 64, 68, 76, 84, 92) sts, pm, work Center Panel specified for your size, pm, work rib as est over 40 (48, 56, 64, 68, 76, 84, 92) sts. 2 sts dec’d. 128 (144, 160, 176, 192, 208, 224, 240) sts Work as est through Row 20 (20, 20, 20, 22, 22, 22, 22) of Center Panel specified for your size. Next row (RS): Work rib as est over 14 (22, 30, 34, 38, 46, 50, 58) sts, pm, using charts specified for your size, work Side Panel B, sm, work Center panel, sm, work Side Panel A, pm, work rib as est over 14 (22, 30, 34, 38, 46, 50, 58) sts.

SIZES A (B, C, -, -, -, -, -) ONLY:

Work Side Panels A-1 and B-1 as est through Row 26, then continue working Rows 21–26 of charts until piece measures 16” / 40.5 cm from CO edge, ending with a WS row. Make note of last row worked in charts.

SIZE D ONLY:

Work Side Panels A-2 and B-2 as est through Row 28, then continue working Rows 23–28 of Side Panels and Rows 21–26 of Center Panel until piece measures 16 ½“ / 42 cm from CO edge, ending with a WS row. Make note of last rows worked in charts.

SIZES - (-, -, -, E, F, -, -) ONLY:

Work Side Panels A-2 and B-2 as est through Row 28, then continue working Rows 23–28 of charts until piece measures 16 ½“ / 42 cm from CO edge, ending with a WS row. Make note of last row worked in charts.

SIZES - (-, -, -, -, -, G, H) ONLY:

Work Side Panels A-3 and B-3 as est through Row 32, then continue working Rows 27–32 of Side Panels and Rows 23–28 of Center Panel until piece measures 17” / 43 cm from CO edge, ending with a WS row. Make note of last rows worked in charts.

VALKYRIE

Updated January 2022

Changes have been made to the body set-up instructions.

New Text for Body set-up on page 4

BEGIN BODY CHARTS

Next row – Decrease row (RS): Work rib as established over 40 (48, 56, 64, 68, 76, 84, 92) sts, pm, work Center Panel specified for your size, pm, work rib as est over 40 (48, 56, 64, 68, 76, 84, 92) sts. 2 sts dec’d. 128 (144, 160, 176, 192, 208, 224, 240) sts Work as est through Row 20 (20, 20, 20, 22, 22, 22, 22) of Center Panel specified for your size. Next row (RS): Work rib as est over 14 (22, 30, 34, 38, 46, 50, 58) sts, pm, using charts specified for your size, work Side Panel B, sm, work Center panel, sm, work Side Panel A, pm, work rib as est over 14 (22, 30, 34, 38, 46, 50, 58) sts.

SIZES A (B, C, -, -, -, -, -) ONLY:

Work Side Panels A-1 and B-1 as est through Row 26, then continue working Rows 21–26 of charts until piece measures 16” / 40.5 cm from CO edge, ending with a WS row. Make note of last row worked in charts.

SIZE D ONLY:

Work Side Panels A-2 and B-2 as est through Row 28, then continue working Rows 23–28 of Side Panels and Rows 21–26 of Center Panel until piece measures 16 ½” / 42 cm from CO edge, ending with a WS row. Make note of last rows worked in charts.

SIZES - (-, -, -, E, F, -, -) ONLY:

Work Side Panels A-2 and B-2 as est through Row 28, then continue working Rows 23–28 of charts until piece measures 16 ½” / 42 cm from CO edge, ending with a WS row. Make note of last row worked in charts.

SIZES - (-, -, -, -, -, G, H) ONLY:

Work Side Panels A-3 and B-3 as est through Row 32, then continue working Rows 27–32 of Side Panels and Rows 23–28 of Center Panel until piece measures 17” / 43 cm from CO edge, ending with a WS row. Make note of last rows worked in charts.

WILDE PULLOVER

Correction made November 3, 2022

Page 4: BACK

Next row (RS): K2, work Row 1 of Garter Fill B over 6 (6, 6, 6, 12, 18, 18, 18) sts, work Row 1 of Body Chart to last 8 (8, 8, 8, 14, 20, 20, 20) sts, work Row 1 of Garter Fill A to last 2 sts, K2.

Page 6: RIGHT FRONT

Next row (WS): P1, work as est to last st, p1. Repeat last two rows 1 more time. 21 (21, 28, 28, 32, 32, 39, 39) sts.

Work as est until armhole measures 7 ¾ (8 ¼, 8 ¾, 9 ¼, 9 ¾, 10 ¼, 10 ¾, 11 ¼)"/ 19.5 (21, 22, 23.5, 25, 26, 27.5, 28.5) cm from underarm marker, ending after a RS row, then shape shoulder as follows:

BO 7 (7, 9, 9, 10, 10, 13, 13) sts at beginning of next 2 WS rows, then BO 7 (7, 10, 10, 11, 11, 13, 13) sts at beginning of following WS row. 21 (21, 28, 28, 32, 32, 39, 39) sts bound off for shoulder. No sts remain.

Page 6: LEFT FRONT

Work as est until armhole measures 7 ¾ (8 ¼, 8 ¾, 9 ¼, 9 ¾, 10 ¼, 10 ¾, 11 ¼)"/ 19.5 (21, 22, 23.5, 25, 26, 27.5, 28.5) cm from underarm m, ending after a WS row, then shape shoulder as follows:

BO 7 (7, 9, 9, 10, 10, 13, 13) sts at beginning of next 2 RS rows then BO 7 (7, 10, 10, 11, 11, 13, 13) sts at beg of following RS row. 21 (21, 28, 28, 32, 32, 39, 39) sts bound off for shoulder. No sts remain.

None

None

None